Informações:
Sinopsis
Weekly update from the CFMEU Construction & General (Vic). Campo takes the wheel and the boys hit the track at a sprint with a call from Simo from the CSR picket in Yarraville. They would love it if you drop by at 277 Whitehall St, Yarraville 6am - 6pm. Industry news plus scallywags and sooks.